May 1, 2024
WISCONSIN – Keller Inc. has been selected as the architect and contractor for several builds throughout Wisconsin.
The builds are as follows:
- A 5,484-square-foot remodel and exterior façade renovation project for Bank of Luxemburg, located at 1311 Bellevue St in Bellevue.
- A building remodel project for Tomah Public Library, located at 716 Superior Ave. in Tomah.
- A building project for Newport Resort, located at 7888 Church St. in Egg Harbor.
- A 6,000-square-foot tunnel car wash building project for Mister Car Wash, located at 5827 75th St. in Kenosha.
- An interior office remodel building project for Next Step Insurance, located at 435 E. Mill St. in Plymouth.
- A building project for Lion Performance Hall, located at 1786 State Highway 175 in Richfield.
- A 9,800-square-foot manufacturing addition project for Adelhelm LubriCoat, located at 621 Baxter Drive in Mukwonago
- A new 6,750-square-foot public works garage alongside a 7,000-square-foot addition to the existing fire station in the Town of Jackson.
- A 51,000-square-foot main facility, a 10,000-square-foot cold storage facility and a salt shed for a new public works facility in the City of Portage.
- Keller also broke ground earlier last month on a building addition at Christ the King Holy Nativity Episcopal Church in Sturgeon Bay, located at 512 Michigan St., which is expected to be completed by Labor Day.